2020 Mercedes-Benz C Class

2.0 C220d AMG Line G-Tronic+ RWD Euro 6 (s/s) 4dr (191 bhp)

£17,995

Fair price: within 8% of the typical £17,237 for this model, age and mileage, drawing on 4,483 adverts of this make and model.

Overview

Make
Mercedes-Benz
Model
C Class
Trim
AMG LINE
Version
2.0 C220d AMG Line G-Tronic+ RWD Euro 6 (s/s) 4dr (191 bhp)
Mileage
59,565 miles
Year
2020
Fuel type
Diesel
Body type
Saloon
Engine
2.0 L
Gearbox
Automatic
Power
191 bhp
Seats
5
CO2
117 g/km
Colour
Silver
Doors
4
Driven wheels
Rear Wheel Drive
Gearbox version
G-Tronic+
Engine badge
C220d
Emissions standard
Euro 6

About this car

At 59,565 miles, this 2020 Mercedes-Benz C Class AMG Line has covered about 11,400 more miles than other 2020 Mercedes-Benz C Class cars. Its asking price of £17,995 is £758 above our estimate of £17,237. The estimate uses 4,483 UK dealer adverts for the Mercedes-Benz C Class, with adjustments for age, mileage, trim, engine and other specifications. We first saw this car advertised 150 days ago. Its asking price has since fallen by £1,000. The latest recorded MOT expiry date is 27 August 2026, which has passed. Confirm its status with the dealer. The latest recorded MOT mileage is consistent with the advertised figure. You can find this car at HR Cars in Chesham.

Stock data from 23 October 2026.

How we estimate prices and check cars

Price history

First seen on 28 May 2026, 150 days ago. Advert duration calculated on 25 October 2026. Net asking-price reduction: £1,000 from the first recorded £18,995. 2 price reductions recorded, the latest observed on 22 October 2026.

Recorded asking prices
Date observedAsking price
28 May 2026£18,995
10 July 2026£18,995
17 October 2026£18,490
22 October 2026£17,995
23 October 2026£17,995

Price and mileage comparison

Estimated market asking price: £17,237. The asking price is £758 above this estimate.

The estimate uses UK dealer asking prices, accounting for make, model, trim, version, age, mileage, fuel, gearbox, body type, driven wheels, engine size and power. It estimates an advertised price, not a confirmed sale price.

The pricing calculation includes 4,483 adverts of this make and model across different ages and specifications.

Advertised mileage is approximately 11,400 miles higher than typical for a 2020 Mercedes-Benz C Class.

The advertised mileage is consistent with the last MOT reading.

The recorded MOT has expired; ask the dealer for an up-to-date MOT.

MOT

MOT valid until 27 August 2026. 55,475 miles at the last test.

16 other cars with the same year, trim, gearbox and fuel are for sale from £11,000 to £22,499.

Other matching cars (up to five, cheapest first)
Asking priceMileage
£11,00095,193 miles
£13,98089,763 miles
£15,54575,450 miles
£16,49573,326 miles
£16,99551,432 miles

These cars have covered 26,056–95,193 miles, compared with 59,565 miles for this car.

Matching year, trim, gearbox and fuel does not mean matching mileage or every specification. Our estimate adjusts for these differences using the wider market data.

Browse all Mercedes-Benz C Class cars for sale · 2020 Mercedes-Benz C Class price guide

How to contact the dealer, its opening hours and the cheaper cars like this one are on this AskCar page.

Vehicle photos

AskCar lists 589,789 cars from 13,079 UK dealer locations, read and updated daily from dealer websites. More than any other UK site. No dealer pays to be listed.