2023 Mercedes-Benz E Class

2.0 E300dh Mhev AMG Line Night Edition Premium Plus G-Tronic+ 4WD Euro 6 (s/s) 2dr (281 bhp)

£34,148

Good value: £4,464 under the typical £38,612 for this model, age and mileage, drawing on 2,931 adverts of this make and model.

Overview

Make
Mercedes-Benz
Model
E Class
Trim
AMG LINE NIGHT EDITION PREMIUM PLUS
Version
2.0 E300dh Mhev AMG Line Night Edition Premium Plus G-Tronic+ 4WD Euro 6 (s/s) 2dr (281 bhp)
Mileage
19,282 miles
Year
2023
Fuel type
Diesel Hybrid
Body type
Coupe
Engine
2.0 L
Gearbox
Automatic
Power
281 bhp
Seats
4
CO2
167 g/km
Colour
Silver
Doors
2
Driven wheels
Four Wheel Drive
Gearbox version
G-Tronic+
Engine badge
E300dh; MHEV
Hybrid type
Mild hybrid
Emissions standard
Euro 6

About this car

This 2023 Mercedes-Benz E Class AMG Line Night Edition Premium Plus is advertised with 19,282 miles, approximately 9,900 below the typical mileage for its age. The dealer is asking £34,148, which is £4,464 below our market estimate of £38,612. Our estimate draws on 2,931 Mercedes-Benz E Class adverts across the UK, adjusting for age, mileage, trim, engine and other specifications. Since we first spotted the advert 44 days ago, the asking price has dropped by £1,473. MOT records show an expiry date of 10 May 2027, and the latest recorded mileage is consistent with the advert. It is for sale at Prestige Cars Kent in Orpington.

Stock data from 22 October 2026.

How we estimate prices and check cars

Price history

First seen on 9 September 2026, 44 days ago. Advert duration calculated on 23 October 2026. Net asking-price reduction: £1,473 from the first recorded £35,621. 7 price reductions recorded, the latest observed on 20 October 2026.

Recorded asking prices
Date observedAsking price
9 September 2026£35,621
17 September 2026£35,501
24 September 2026£35,287
28 September 2026£35,089
6 October 2026£34,917
10 October 2026£34,703
17 October 2026£34,356
20 October 2026£34,148
22 October 2026£34,148

Price and mileage comparison

Estimated market asking price: £38,612. The asking price is £4,464 below this estimate.

The estimate uses UK dealer asking prices, accounting for make, model, trim, version, age, mileage, fuel, gearbox, body type, driven wheels, engine size and power. It estimates an advertised price, not a confirmed sale price.

The pricing calculation includes 2,931 adverts of this make and model across different ages and specifications.

Advertised mileage is approximately 9,900 miles lower than typical for a 2023 Mercedes-Benz E Class.

The advertised mileage is consistent with the last MOT reading.

MOT

MOT valid until 10 May 2027. 16,600 miles at the last test.

10 other cars with the same year, trim, gearbox and fuel are for sale from £29,950 to £41,990.

Other matching cars (up to five, cheapest first)
Asking priceMileage
£29,95058,128 miles
£31,55046,438 miles
£31,99525,525 miles
£32,90024,570 miles
£32,99530,571 miles

These cars have covered 10,293–58,128 miles, compared with 19,282 miles for this car.

Matching year, trim, gearbox and fuel does not mean matching mileage or every specification. Our estimate adjusts for these differences using the wider market data.

Browse all Mercedes-Benz E Class cars for sale · 2023 Mercedes-Benz E Class price guide

How to contact the dealer, its opening hours and the cheaper cars like this one are on this AskCar page.

Vehicle photos

AskCar lists 588,092 cars from 13,071 UK dealer locations, read and updated daily from dealer websites. More than any other UK site. No dealer pays to be listed.